1. Underground construction: Fully buried construction, with the ability to cover the ground for greening and good landscape effect.
2. Low energy consumption and low noise: The aeration adopts Sino Japanese joint venture fans, which have high air volume, low energy consumption, and low noise.
3. Low operating costs: Low operating cost per ton of water and long service life of FRP fiberglass material.
4. Automatic operation: Adopting automatic control, fully automatic unmanned operation 24 hours a day. An independently developed remote monitoring system that monitors data in real-time.
5. High degree of integration and flexible selection:
· Integrated and integrated design, flexible selection, short construction period.
· There is no need to mobilize large-scale human and material resources on site, and the equipment can operate stably after construction.
6. Advanced technology and good processing effect:
· The equipment uses fillers with a larger specific surface area, which increases the volumetric load.
· Reduce land area, have strong operational stability, and ensure stable effluent meets standards.
Processing capacity(m³/d) |
5 |
10 |
15 |
20 |
30 |
40 |
50 |
60 |
80 |
100 |
Size(m) |
Φ2*2.7 |
Φ2*3.8 |
Φ2.2*4.3 |
Φ2.2*5.3 |
Φ2.2*8 |
Φ2.2*10 |
Φ2.2*11.5 |
Φ2.2*8*2 |
Φ2.2*10*2 |
Φ2.2*11.5*2 |
Weight(t) |
1.8 |
2.5 |
2.8 |
3.0 |
3.5 |
4.0 |
4.5 |
7.0 |
8.0 |
9.0 |
Installed power(kW) |
0.75 |
0.87 |
0.87 |
1 |
1.22 |
1.22 |
1.47 |
2.44 |
2.44 |
2.94 |
Operating power(Kw*h/m³) |
1.16 |
0.89 |
0.60 |
0.60 |
0.60 |
0.48 |
0.49 |
0.60 |
0.48 |
0.49 |
Effluent quality |
COD≤100,BOD5≤20,SS≤20,NH3-N≤8,TP≤1 |
Note: The above data are for reference only, parameters and selection are subject to confirmation by both parties, combinations can be used, other non-standard tonnage can be customized.
Suitable for decentralized sewage treatment projects in new rural areas, scenic spots, service areas, rivers, hotels, hospitals, etc.